Bankrupt Eskom holds ANC regime hostage with ongoing #RollingBlackOuts

#RollingBlackouts are back due to a shortage of power generation at Eskom power stations contributed by lack of skill

South Africans should brace for more rolling blackouts as the power grid is unstable and cannot produce enough power to sustain the country

Kusile and Medupi power stations do not deliver planned 780MW at the moment, while loadshedding is currently being utilized all over South-Africa – Somebody is definitely making some money from Eskom while we are suffering